Mechanical Treatment Section was commissioned to treat profiles as semi-finished/finished products CNC cutting, milling, lathe, treatment centers, CNC pipe and profile bending lines and MIG/TIG welders.
Capacity of Hot Top Air – Slip vertical billet casting facility was increased to 60.000 tons/year.
154/34.5 kV transformer station (switching station) was commissioned on the own land of ASAŞ, and uninterrupted and appropriate electricity energy was supplied.
ASAS GmbH was founded in November 2017.
PVC production facility was increased to 26 line,s and the capacity exceeded 30.000 tons.
The capacity of the Aluminium Flat Products facility reached 121,000 tons/year for sheet, coated, and foil products.
A steel heat treatment facility, consisting of Turkey's largest vacuum hardening and nitriding furnaces, was established.
Two coating lines, one thin and one thick, were commissioned at the Aluminium Flat Products facility.
9 five-axis CNC machining lines and robotic automation were installed in the extrusion facility.
The second cold rolling investment in the Flat Products plant doubled its capacity.
A ready-made joinery facility capable of producing 200 units per shift has been launched.
The world’s first 45 MN Hybrex Press was commissioned.
The PVC production facility will reach a total of 33 extrusion lines, consisting of 31 twin-screw and 2 single-screw lines.
In 2025, the largest extrusion press in Europe (150 MN) will be commissioned.